Skip to main content

Why Is a Finished Visit Locked?

The visit screen opens a visit that is already finished with everything the engineer sent locked, so that a correction is always a deliberate choice and never a slip of the keyboard. A bar above the Overview says the visit is locked, and Edit this visit on that bar opens it for change. As soon as the change is saved, the visit is locked again.

Why is this visit locked?​

The visit screen locks a visit whose saved status is Finished, Closed, Matched, Cancelled or Send Error: the work is over, and its times, resolution and forms are the engineer's record of it. A bar above the Overview says so, for example "This visit is Finished. Its times, resolution, fields, status and files are locked.", with Edit this visit on the right.

While a visit is locked:

  • The four time tiles and the Resolution show a padlock where the pen would be. Their text can still be selected and copied, but not changed.
  • Your company's own visit fields on the Overview cannot be changed.
  • Status in the header, Attach files in the Attachments section, and Save changes on a file's details do nothing when pressed except say, beside the button, "This visit is Finished: press Edit this visit to change it."
  • Save at the top of the visit screen has nothing to save. If changes typed earlier are still waiting on the visit, pressing it says "Press Edit this visit to save your changes over it."
  • A file dropped on an item of the sidebar's Attachments group is not added, and the same sentence appears beside Edit this visit. The Attachments section itself does not take dropped files while the visit is locked.

The lock follows the status the visit is saved with. Choosing a status in the Status menu and not saving it yet locks or unlocks nothing. Every other status, such as Active, On Site or Complete, is open for change with no bar at all.

Anyone who can open the visit screen can press Edit this visit.

What can I still do on a locked visit?​

On a locked visit you can still read and use everything that does not change the visit. The bar stands only above the Overview and All attachments; Status history and Products used have nothing to change and carry no bar.

On a locked visit you can:

  • Read every section, select and copy text, and look at photos, forms and signatures full size.
  • Open and Download the visit's files.
  • Set location, which gives the customer a pin on the map: it changes the customer, not the visit.
  • Change the Overview's layout, or switch to another saved layout.
  • Open the call, open the customer, and go Back.

The system administrator can still use Manage categories… in the sidebar, because the categories belong to the company, not to the visit.

How do I change a visit that is already finished?​

Press Edit this visit on the bar above the visit screen's Overview, make your change, and press Save. The bar turns amber and reads, for example, "You are changing a visit that is already Finished. What you save replaces what the engineer sent."

  1. Open the visit.
  2. Press Edit this visit on the bar above the Overview or above All attachments.
  3. Change the times, travel, resolution, status, fields or files as you need.
  4. Press Save at the top right of the visit screen, or press Ctrl and S together (Ctrl+S).

After a visit-field save that leaves nothing else unsaved, the visit is locked again and the bar goes back to its locked words. If you kept typing while the save was on its way, the visit stays open until that is saved or thrown away too.

What you save replaces what the engineer's phone sent, and it is written as a change from the office; a status change shows in Status history with your name and "office". How to Change a Visit's Times, Travel, Status or Resolution explains each field.

How do I lock a visit again without saving?​

Press Lock again on the amber bar of the visit screen. If you have typed nothing, the visit is locked again straight away. If you have typed something, the button reads Discard and lock instead: pressing it throws away everything typed on the visit, including a comment, category or memo typed into one of the visit's files and not saved, and locks it.

Discard on the Unsaved changes bar at the foot of the screen throws away the visit-field changes and locks the visit. It leaves unsaved attachment details in place. To discard both, use Discard and lock on the amber bar.

Neither button changes anything already saved. To undo a change you have already saved, open the visit again with Edit this visit, type the old value back and save.

Why is the visit locked again when I come back to it?​

Because unlocking lasts only while you are on the visit with nothing to save. If you press Edit this visit, type nothing and leave the visit screen, by any way, it opens locked the next time.

If you leave with something typed and not saved, the visit keeps it, and comes back still open for change with your typing in place. A chip naming the visit stays on screen meanwhile, so you can return to it; see What Happens to Unsaved Changes When You Leave a Screen. A detail typed into one of the visit's files and not saved counts the same way.

Why did saving say "This visit is Finished now, so it is locked"?​

Because the visit was finished while you were typing on it. You opened the visit while it was open for change, for example On Site, the engineer's phone then sent Finished, and you pressed Save. ABM Service refuses that save so that you do not overwrite the finished visit without seeing it: "This visit is Finished now, so it is locked. Press Edit this visit to save your changes over it."

Nothing is saved, and your typing is kept. The visit screen now shows the visit as it is, with the locked bar. Check what the engineer sent, then:

  1. Press Edit this visit on the bar. The refusal message goes away.
  2. Press Save again to save your changes over the finished visit.

To keep what the engineer sent, press Discard on the Unsaved changes bar. If you have already pressed Edit this visit, you can instead press Discard and lock.